Navi Mumbai: Civic body approved the proposal of the flyover project which will connect Nerul East to west along the Nerul Railways station. The civic body has allocated a budget of about Rs 28.24 crore and will soon dispatch notice inviting the tenders for the development of the project. The Flyover would be situated between Nerul Railway station and Terna Institute to connect sectors 21 and 28 of Nerul locality.The demand for this flyover was raised from residents of the area. The travelling from both sides was time consuming and the proposal of the flyover was made to reduce the travelling distance and time for commuters.Commuters have to take a long route via Rajiv Gandhi Flyover at Juinagar end or the seawoods flyover at CBD end to travel from Nerul East to West. The proposed flyover will reduce the travelling distance and will also help to avoid traffic bottlenecks on the alternate routes.Navi Mumbai Municipal Corporation’s general civic body looked into the proposal and finally gave its nod and has asked to float tenders for the project. The process of inviting tenders and then issuing the work order will last for about three months and once the project is commenced it would have a deadline of 18 months to complete the construction. The technical details and construction blueprints will be drawn up very soon by the administration.Once the flyover is completed, it will be used for light vehicles and will also have footpaths on both sides for residents. The currently used travelling modes like Rajiv Gandhi Flyover and Seawood Flyover will be used for heavy traffic.займ на карту без отказов круглосуточновзять кредит онлайн
