{"id":29970,"date":"2015-03-06T11:11:01","date_gmt":"2015-03-06T05:41:01","guid":{"rendered":"http:\/\/www.bharatestates.com\/blog\/?p=29970"},"modified":"2020-06-15T03:08:06","modified_gmt":"2020-06-14T21:38:06","slug":"29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects","status":"publish","type":"post","link":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/","title":{"rendered":"Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects"},"content":{"rendered":"<p><strong><a href=\"https:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2015\/03\/mega-building.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-29971\" alt=\"mega-building\" src=\"https:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2015\/03\/mega-building.jpg\" width=\"300\" height=\"250\" \/><\/a>Mumbai:<\/strong> The state environment department has suggested to eliminate the compulsory eco-clearances for the construction of mega building projects in the state and has delegated the duties to the local bodies.According to the housing industry, around 50 % of the development in the state capital, Mumbai covers such kind of constructions that is over 2 lakh square feet of area.The principal secretary said that the proposal was sent last month and the Ministry of Environment andForests have taken this under consideration. In any case, the projects have to undergo various municipal clearances, thus the state government is trying to ease the process by reducing one level of clearance.The municipal bodies have to scrutinize the projects under various parameters which include sewage and garbage disposal plans and also water supply and rainwater harvesting plans will be checked.According to the president of National Real Estate Development Council, a lot of time is wasted in the lengthy approval process and paperwork, however if the proposal gets sanctioned, only single-window clearance will be followed for these mega projects. The municipality will be well set to check if the conditions are followed.This drive will also accelerate the development of the projects, the housing industry said. However the state environment department claims that government is attempting to eliminate its responsibilities to protect the environmental norms.<span style=\"left:100%;display:inline-block;position:fixed\"><a href=\"http:\/\/rusbankinfo.ru\/\">\u0437\u0430\u0439\u043c \u043d\u0430 \u043a\u0430\u0440\u0442\u0443 \u0431\u0435\u0437 \u043e\u0442\u043a\u0430\u0437\u043e\u0432 \u043a\u0440\u0443\u0433\u043b\u043e\u0441\u0443\u0442\u043e\u0447\u043d\u043e<\/a><a href=\"http:\/\/rusbankinfo.ru\/credits.html\">\u0432\u0437\u044f\u0442\u044c \u043a\u0440\u0435\u0434\u0438\u0442 \u043e\u043d\u043b\u0430\u0439\u043d<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mumbai: The state environment department has suggested to eliminate the compulsory eco-clearances for the construction of mega building projects in the state and has delegated the duties to the local bodies.According to the housing industry, around 50 % of the development in the state capital, Mumbai covers such kind of constructions that is over 2 [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-29970","post","type-post","status-publish","format-standard","hentry","category-realty-news"],"blocksy_meta":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects -<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects -\" \/>\n<meta property=\"og:description\" content=\"Mumbai: The state environment department has suggested to eliminate the compulsory eco-clearances for the construction of mega building projects in the state and has delegated the duties to the local bodies.According to the housing industry, around 50 % of the development in the state capital, Mumbai covers such kind of constructions that is over 2 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/divya.mudliar.35\" \/>\n<meta property=\"article:published_time\" content=\"2015-03-06T05:41:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-06-14T21:38:06+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2015\/03\/mega-building.jpg\" \/>\n<meta name=\"author\" content=\"divya\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"divya\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/\"},\"author\":{\"name\":\"divya\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/#\\\/schema\\\/person\\\/412acf5ae84eee5775e5f0c004b98743\"},\"headline\":\"Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects\",\"datePublished\":\"2015-03-06T05:41:01+00:00\",\"dateModified\":\"2020-06-14T21:38:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/\"},\"wordCount\":243,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/www.bharatestates.com\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/03\\\/mega-building.jpg\",\"articleSection\":[\"Realty News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/\",\"url\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/\",\"name\":\"Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects -\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/www.bharatestates.com\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/03\\\/mega-building.jpg\",\"datePublished\":\"2015-03-06T05:41:01+00:00\",\"dateModified\":\"2020-06-14T21:38:06+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/#\\\/schema\\\/person\\\/412acf5ae84eee5775e5f0c004b98743\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/#primaryimage\",\"url\":\"http:\\\/\\\/www.bharatestates.com\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/03\\\/mega-building.jpg\",\"contentUrl\":\"http:\\\/\\\/www.bharatestates.com\\\/blog\\\/wp-content\\\/uploads\\\/2015\\\/03\\\/mega-building.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/\",\"name\":\"\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/#\\\/schema\\\/person\\\/412acf5ae84eee5775e5f0c004b98743\",\"name\":\"divya\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/62077b5830024013283a6832405e2ba9baaf07042d540dea6acac87688cd99cd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/62077b5830024013283a6832405e2ba9baaf07042d540dea6acac87688cd99cd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/62077b5830024013283a6832405e2ba9baaf07042d540dea6acac87688cd99cd?s=96&d=mm&r=g\",\"caption\":\"divya\"},\"description\":\"Writer by profession and by choice. Creativity and imagination are her two key distinguished elements when it comes to writing. The author is keen about exploring new trends and styles in interior decor and primarily focuses on its relative segment. She enjoys sharing her ideas on styling home interiors. Apart from that the author is also enthralled about writing on luxurious projects and real estate trends.\",\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/divya.mudliar.35\"],\"url\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/author\\\/divya\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects -","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/","og_locale":"en_US","og_type":"article","og_title":"Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects -","og_description":"Mumbai: The state environment department has suggested to eliminate the compulsory eco-clearances for the construction of mega building projects in the state and has delegated the duties to the local bodies.According to the housing industry, around 50 % of the development in the state capital, Mumbai covers such kind of constructions that is over 2 [&hellip;]","og_url":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/","article_author":"https:\/\/www.facebook.com\/divya.mudliar.35","article_published_time":"2015-03-06T05:41:01+00:00","article_modified_time":"2020-06-14T21:38:06+00:00","og_image":[{"url":"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2015\/03\/mega-building.jpg","type":"","width":"","height":""}],"author":"divya","twitter_misc":{"Written by":"divya","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/#article","isPartOf":{"@id":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/"},"author":{"name":"divya","@id":"https:\/\/www.bharatestates.com\/blog\/#\/schema\/person\/412acf5ae84eee5775e5f0c004b98743"},"headline":"Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects","datePublished":"2015-03-06T05:41:01+00:00","dateModified":"2020-06-14T21:38:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/"},"wordCount":243,"commentCount":0,"image":{"@id":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/#primaryimage"},"thumbnailUrl":"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2015\/03\/mega-building.jpg","articleSection":["Realty News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/","url":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/","name":"Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects -","isPartOf":{"@id":"https:\/\/www.bharatestates.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/#primaryimage"},"image":{"@id":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/#primaryimage"},"thumbnailUrl":"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2015\/03\/mega-building.jpg","datePublished":"2015-03-06T05:41:01+00:00","dateModified":"2020-06-14T21:38:06+00:00","author":{"@id":"https:\/\/www.bharatestates.com\/blog\/#\/schema\/person\/412acf5ae84eee5775e5f0c004b98743"},"breadcrumb":{"@id":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/#primaryimage","url":"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2015\/03\/mega-building.jpg","contentUrl":"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2015\/03\/mega-building.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bharatestates.com\/blog\/29970-maharashtra-state-waiting-for-positive-reply-from-local-bodies-for-mega-building-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.bharatestates.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Maharashtra State Waiting for Positive Reply from Local Bodies for Mega Building Projects"}]},{"@type":"WebSite","@id":"https:\/\/www.bharatestates.com\/blog\/#website","url":"https:\/\/www.bharatestates.com\/blog\/","name":"","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.bharatestates.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.bharatestates.com\/blog\/#\/schema\/person\/412acf5ae84eee5775e5f0c004b98743","name":"divya","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/62077b5830024013283a6832405e2ba9baaf07042d540dea6acac87688cd99cd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/62077b5830024013283a6832405e2ba9baaf07042d540dea6acac87688cd99cd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/62077b5830024013283a6832405e2ba9baaf07042d540dea6acac87688cd99cd?s=96&d=mm&r=g","caption":"divya"},"description":"Writer by profession and by choice. Creativity and imagination are her two key distinguished elements when it comes to writing. The author is keen about exploring new trends and styles in interior decor and primarily focuses on its relative segment. She enjoys sharing her ideas on styling home interiors. Apart from that the author is also enthralled about writing on luxurious projects and real estate trends.","sameAs":["https:\/\/www.facebook.com\/divya.mudliar.35"],"url":"https:\/\/www.bharatestates.com\/blog\/author\/divya\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/posts\/29970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/comments?post=29970"}],"version-history":[{"count":1,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/posts\/29970\/revisions"}],"predecessor-version":[{"id":30523,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/posts\/29970\/revisions\/30523"}],"wp:attachment":[{"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/media?parent=29970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/categories?post=29970"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/tags?post=29970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}