{"id":24611,"date":"2013-09-25T10:51:52","date_gmt":"2013-09-25T05:21:52","guid":{"rendered":"http:\/\/www.bharatestates.com\/blog\/?p=24611"},"modified":"2020-06-15T03:38:57","modified_gmt":"2020-06-14T22:08:57","slug":"24611-jaipur-metro-rail-on-track-for-trial-run","status":"publish","type":"post","link":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/","title":{"rendered":"Jaipur Metro Rail on Track for Trial Run"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-24612\" alt=\"jaipur-metro\" src=\"https:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2013\/09\/jaipur-metro.jpg\" width=\"300\" height=\"250\" \/>The Jaipur Metro Project successfully got completed with the record time of two and a half years and commenced its trial run on Tuesday. The project is developed by Delhi Metro Rail Corporation (DMRC) along with Jaipur Metro Rail Corporation (JMRC). The trial run was flagged off by Chief Minister of Rajasthan. Managing Director of DMRC and other dignitaries also attended the inauguration ceremony.The trial run which is compulsory obligation for commissioning of the Metro corridors, started off between Mansarovar and the Shyam Nagar stations of 9.5 km long Mansarovar \u2013 Chandpole corridor.The Pink line of the Pink city which is Phase 1A of Jaipur <a href=\"https:\/\/www.bharatestates.com\/blog\/metro-rail-projects-connecting-india-to-a-better-future\/\">Metro Rail Project<\/a> comprises of 9 stations and is likely to start its operation from next month. The initial trial run which took place on Tuesday covered four kms consisting of four metro stations. The trial run will be extended gradually for the remaining corridors too.In 2010, DMRC and JMRC signed an agreement based on which the Delhi Metro Rail Corporation is constructing corridor for Jaipur metro.The 9.25 km extended stretch is a part of 11. 566 km long Mansarovar \u2013 Badi Chaupar corridor parallel to the east-west direction under Jaipur Metro Rail, Phase I. The second metro corridor under Jaipur Metro Phase II, aligned along north-south direction starting from Durgapura to Ambabari will be a 23 kms long stretch.This metro project is DMRC\u2019s first project ever outside National Capital Region. DMRC has worked as a consultant for planning and executing metro rail projects in various cities like Bangalore, Mumbai, Chennai, Kolkata, Hyderabad, Ahmedabad, Ludhiana, Pune and many others. Currently DMRC is working on Kochi Metro Project which is 25.253 long stretch corridor from Aluva to Petta.<span style=\"left:100%;display:inline-block;position:fixed\"><a href=\"http:\/\/rusbankinfo.ru\/\">\u0437\u0430\u0439\u043c \u043d\u0430 \u043a\u0430\u0440\u0442\u0443 \u0431\u0435\u0437 \u043e\u0442\u043a\u0430\u0437\u043e\u0432 \u043a\u0440\u0443\u0433\u043b\u043e\u0441\u0443\u0442\u043e\u0447\u043d\u043e<\/a><a href=\"http:\/\/rusbankinfo.ru\/credits.html\">\u0432\u0437\u044f\u0442\u044c \u043a\u0440\u0435\u0434\u0438\u0442 \u043e\u043d\u043b\u0430\u0439\u043d<\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Jaipur Metro Project successfully got completed with the record time of two and a half years and commenced its trial run on Tuesday. The project is developed by Delhi Metro Rail Corporation (DMRC) along with Jaipur Metro Rail Corporation (JMRC). The trial run was flagged off by Chief Minister of Rajasthan. Managing Director of [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-24611","post","type-post","status-publish","format-standard","hentry","category-realty-news"],"blocksy_meta":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Jaipur Metro Rail on Track for Trial Run -<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Jaipur Metro Rail on Track for Trial Run -\" \/>\n<meta property=\"og:description\" content=\"The Jaipur Metro Project successfully got completed with the record time of two and a half years and commenced its trial run on Tuesday. The project is developed by Delhi Metro Rail Corporation (DMRC) along with Jaipur Metro Rail Corporation (JMRC). The trial run was flagged off by Chief Minister of Rajasthan. Managing Director of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/gayatri.subramanian\" \/>\n<meta property=\"article:published_time\" content=\"2013-09-25T05:21:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-06-14T22:08:57+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2013\/09\/jaipur-metro.jpg\" \/>\n<meta name=\"author\" content=\"gayatri\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"gayatri\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/\"},\"author\":{\"name\":\"gayatri\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/#\\\/schema\\\/person\\\/1180a0f24df7b14521fe8fa55b2391fc\"},\"headline\":\"Jaipur Metro Rail on Track for Trial Run\",\"datePublished\":\"2013-09-25T05:21:52+00:00\",\"dateModified\":\"2020-06-14T22:08:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/\"},\"wordCount\":295,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/www.bharatestates.com\\\/blog\\\/wp-content\\\/uploads\\\/2013\\\/09\\\/jaipur-metro.jpg\",\"articleSection\":[\"Realty News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/\",\"url\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/\",\"name\":\"Jaipur Metro Rail on Track for Trial Run -\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/www.bharatestates.com\\\/blog\\\/wp-content\\\/uploads\\\/2013\\\/09\\\/jaipur-metro.jpg\",\"datePublished\":\"2013-09-25T05:21:52+00:00\",\"dateModified\":\"2020-06-14T22:08:57+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/#\\\/schema\\\/person\\\/1180a0f24df7b14521fe8fa55b2391fc\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/#primaryimage\",\"url\":\"http:\\\/\\\/www.bharatestates.com\\\/blog\\\/wp-content\\\/uploads\\\/2013\\\/09\\\/jaipur-metro.jpg\",\"contentUrl\":\"http:\\\/\\\/www.bharatestates.com\\\/blog\\\/wp-content\\\/uploads\\\/2013\\\/09\\\/jaipur-metro.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/24611-jaipur-metro-rail-on-track-for-trial-run\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Jaipur Metro Rail on Track for Trial Run\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/\",\"name\":\"\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/#\\\/schema\\\/person\\\/1180a0f24df7b14521fe8fa55b2391fc\",\"name\":\"gayatri\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/05fef446311c70b4602d4501b704f7ff0efeba003ed7d981a68b741b2d819a2c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/05fef446311c70b4602d4501b704f7ff0efeba003ed7d981a68b741b2d819a2c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/05fef446311c70b4602d4501b704f7ff0efeba003ed7d981a68b741b2d819a2c?s=96&d=mm&r=g\",\"caption\":\"gayatri\"},\"description\":\"The power of writing drives the author into exploring exciting dimensions of life. Testing new waters have always been a part of her writing expeditions. Writing becomes more enjoyable when you become one with it; this keeps her glued to capturing \u2018Whats New and In-Vogue\u2019. The author thoroughly adores writing on real estate which opens up fascinating avenues of research and analysis with creativity at play!\",\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/gayatri.subramanian\",\"https:\\\/\\\/x.com\\\/gayatris2106\"],\"url\":\"https:\\\/\\\/www.bharatestates.com\\\/blog\\\/author\\\/gayatri-s\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Jaipur Metro Rail on Track for Trial Run -","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/","og_locale":"en_US","og_type":"article","og_title":"Jaipur Metro Rail on Track for Trial Run -","og_description":"The Jaipur Metro Project successfully got completed with the record time of two and a half years and commenced its trial run on Tuesday. The project is developed by Delhi Metro Rail Corporation (DMRC) along with Jaipur Metro Rail Corporation (JMRC). The trial run was flagged off by Chief Minister of Rajasthan. Managing Director of [&hellip;]","og_url":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/","article_author":"https:\/\/www.facebook.com\/gayatri.subramanian","article_published_time":"2013-09-25T05:21:52+00:00","article_modified_time":"2020-06-14T22:08:57+00:00","og_image":[{"url":"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2013\/09\/jaipur-metro.jpg","type":"","width":"","height":""}],"author":"gayatri","twitter_misc":{"Written by":"gayatri","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/#article","isPartOf":{"@id":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/"},"author":{"name":"gayatri","@id":"https:\/\/www.bharatestates.com\/blog\/#\/schema\/person\/1180a0f24df7b14521fe8fa55b2391fc"},"headline":"Jaipur Metro Rail on Track for Trial Run","datePublished":"2013-09-25T05:21:52+00:00","dateModified":"2020-06-14T22:08:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/"},"wordCount":295,"commentCount":0,"image":{"@id":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/#primaryimage"},"thumbnailUrl":"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2013\/09\/jaipur-metro.jpg","articleSection":["Realty News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/","url":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/","name":"Jaipur Metro Rail on Track for Trial Run -","isPartOf":{"@id":"https:\/\/www.bharatestates.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/#primaryimage"},"image":{"@id":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/#primaryimage"},"thumbnailUrl":"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2013\/09\/jaipur-metro.jpg","datePublished":"2013-09-25T05:21:52+00:00","dateModified":"2020-06-14T22:08:57+00:00","author":{"@id":"https:\/\/www.bharatestates.com\/blog\/#\/schema\/person\/1180a0f24df7b14521fe8fa55b2391fc"},"breadcrumb":{"@id":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/#primaryimage","url":"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2013\/09\/jaipur-metro.jpg","contentUrl":"http:\/\/www.bharatestates.com\/blog\/wp-content\/uploads\/2013\/09\/jaipur-metro.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bharatestates.com\/blog\/24611-jaipur-metro-rail-on-track-for-trial-run\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.bharatestates.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Jaipur Metro Rail on Track for Trial Run"}]},{"@type":"WebSite","@id":"https:\/\/www.bharatestates.com\/blog\/#website","url":"https:\/\/www.bharatestates.com\/blog\/","name":"","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.bharatestates.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.bharatestates.com\/blog\/#\/schema\/person\/1180a0f24df7b14521fe8fa55b2391fc","name":"gayatri","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/05fef446311c70b4602d4501b704f7ff0efeba003ed7d981a68b741b2d819a2c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/05fef446311c70b4602d4501b704f7ff0efeba003ed7d981a68b741b2d819a2c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/05fef446311c70b4602d4501b704f7ff0efeba003ed7d981a68b741b2d819a2c?s=96&d=mm&r=g","caption":"gayatri"},"description":"The power of writing drives the author into exploring exciting dimensions of life. Testing new waters have always been a part of her writing expeditions. Writing becomes more enjoyable when you become one with it; this keeps her glued to capturing \u2018Whats New and In-Vogue\u2019. The author thoroughly adores writing on real estate which opens up fascinating avenues of research and analysis with creativity at play!","sameAs":["https:\/\/www.facebook.com\/gayatri.subramanian","https:\/\/x.com\/gayatris2106"],"url":"https:\/\/www.bharatestates.com\/blog\/author\/gayatri-s\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/posts\/24611","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/comments?post=24611"}],"version-history":[{"count":1,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/posts\/24611\/revisions"}],"predecessor-version":[{"id":31351,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/posts\/24611\/revisions\/31351"}],"wp:attachment":[{"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/media?parent=24611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/categories?post=24611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bharatestates.com\/blog\/wp-json\/wp\/v2\/tags?post=24611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}